* add shuttle
* change station
Changes from Box to Marathon
* address issues
- switch one of the glass walls for a shuttle wall
- added another generator and redesigned the engineering compartment
- added directional reinforced walls for the seating area
- added more chairs!
- another seat for medbay
- shrunk the size of bar and moved bridge doors
- rotated the fireaxe, APCs and wall cabinets to face the correct way
- removed the bardrobe and clothesmate
- other miscellaneous fixes